Socialist Shithead Who LOVES Wind Power Now Concerned About New Transmission Lines “Scarring” The Land.

Costanza in a cowboy hat is suddenly worried about transmission lines:

You know what REALLY necessitated a TON of transmission lines (3500 miles of them)? Your beloved wind power and the 19,000 pinwheels that are scattered all over hell’s half acre and needed all those lines to bring the power to where it is needed. According to Gemini AI:

To support its massive fleet of nearly 19,000 wind turbines, Texas built approximately 3,500 to 3,600 miles of high-voltage transmission lines.

This massive infrastructure build-out was driven by a specific, state-mandated initiative known as the Competitive Renewable Energy Zones (CREZ) project

Not only that, but those pinwheels are an ugly blight on the land all by themselves AND the fiberglass blades are simply buried in a hole after they wear out in about 20 years….

Comrade Clayton never said a PEEP about transmission lines or “scarring” of the land when the costly and unreliable wind turbines were being thrown up everywhere and subsidized by hundreds of billions of tax dollars.

But NOW he’s all concerned because he lives and breathes data centers now. He needs to find more and more phantom reasons to bash them.

These tech companies know there is not enough power for them to hook into the grid – which is why almost ALL of them are building their own power sources right at the data centers. Natural gas and nukes, to be precise. So there are NO transmission lines needed, you retard boy!!

Also, wind requires HUNDREDS OF TIMES more space and “scarring of the land” than nuclear power:

For the 100th time, Comrade Clayton shows us what an unintelligent hypocrite and bozo he really is.